  • 2008 Aiken High School Offsite Sewer – City of Aiken
    • Pipe Bursting (pneumatic) – 2,500 LF total
    • 10”VCT to 10” HDPE pipe
    • Manhole Rehab epoxy lining - 100 v.ft.
    • Contract Amount $120,560.
  • 2007 Sewer System Rehab – City of Trenton TN
    • Pipe Bursting (pneumatic ) - 5,500 LF total
    • 6” VCT to 8” HDPE pipe - 4,000 LF
    • 10” VCT to 12” HDPE pipe - 1,500 LF
    • Manhole Rehab cementious lining -120 v.ft.
    • Service Reconnections 6”PVC – 26 ea.
    • Contract Amount $479,909,000
  • 2007 Sewer System Rehab – City of Dalton, GA
    • Pipe Bursting (pneumatic) – 6,450 LF total
    • 6” & 8” VCT to 8”HDPE pipe – 5,600 LF
    • 10” VCT to 10” HDPE pipe - 750 LF
    • Open Cut 8” DIPS; Gravity Sewer 6 ft. to 16 ft in depth - 2,500 LF
    • Service Reconnections  4” PVC – 26 ea.
    • TV Video & Cleaning – 175,00 LF
    • Smoke Testing – 15,000 LF
    • Manhole Rehab epoxy lining – 335 v. ft.
    • Contract Amount: $805,303.00
  • 2007 Sewer System Rehab – City of Union City, TN
    • Pipe Bursting (pneumatic)
    •       6” & 8” VCT to 8” HDPE pipe – 4036 LF
    • CIPP; 8” pipe - 2193 LF
    • Manhole Rehab cementious lining – 100 v.ft
    • Service Reconnections 4” PVC – 79 ea.
    • Contract Amount: $527,071.00
  • 2006 Riverbend Sewer Rehab – City of Clinton, TN
    • Pipe Bursting (Static) – 1,530 LF total
    • 18” VCT to 20” HDPE pipe
    • By pass pumping of 18” sewer with two 6” pumps sewage
    • Contract Amount: $203,216
  • 2006 Gulf Shores Sewer Rehab – Phase 1 – Gulf Shores, AL
    • Pipe Bursting (static) – 26,360 LF total
    • 8”VCT to 10”HDPE pipe- 12,800 LF
    • 8”VCT to 12”HDPE pipe -  6,200 LF
    • 8” VCT to 12” DI Pipe - 260 LF
    • 10 VCT to 10 HDPE pipe  -  1,800 LF
    • 10 VCT to 12” HDPE pipe-  3,500 LF
    • Service Reconnections - 6” PVC – 355 ea.
    • Well Pointing – 6 to 20 v.ft. – 22,000 LF
    • Temporary Sheet Piling – 12 to 25 v.ft. – 2,100 LF
    • Contract Amount: $5,971,500.00
  • 2005 Sewer System Rehab – City of Rainbow City, AL
    • Pipe Bursting (static) – 5,150 LF total
    • 10” VCT to 10” HDPE pipe - 3,900 LF
    • 10” VCT to 12” HDPE pipe - 1,250 LF
    • Service Reconnections 6”PVC – 7 ea.
    • Contract Amount:  $287,715.80
  • 2005 Sewer System Rehab – City of Dalton, GA
    • Pipe Bursting (pneumatic)- 13,600 LF
    •      8” VCT to 8” HDPE pipe
    • Open Cut 8” DIPS; 8 ft. to 10 ft. in depth - 1,000 LF
    • Manhole Rehab epoxy lining – 200 v.ft.
    • Service Reconnections 4” PVC – 90 ea.
    • Cleaning and TV Inspection; 124,000 LF
    • Smoke Testing; 605,000 LF
    • Contract Amount $1,694,297.88
  • 2005 Highway 9 Sewer Extension –Spartanburg, SC Sanitary Sewer District
    • Gravity Sewer 12” PVC pipe; 0 ft. to 20 ft. in depth – 8,700 LF
    • Force Main 8” SDR 18” PVC pipe – 1,900 LF
    • Precast Manholes (4 ft. dia) – 30 ea.
    • Jack & Bore 20” Casing (12” D.I. pipe) – 80 LF
    • Pump Station – Precast with 2 FLYGT submersible pumps
    • Contract Amount $468,200.00
  • 2005 Sanitary Sewer Rehabilitation – City of Millen, GA
    • Pipe Bursting - 6, 600 LF total
    • 4” VCT to 6”HDPE pipe - 2,500 LF (static)
    • 8” VCT to 8” HDPE pipe - 3,500 LF (pneumatic)
    • 8” VCT to 10”HDPE pipe - 400 LF (static)
    • 8” VCT to 12”HDPE pipe - 200 LF (static)
    • Open Cut Gravity Sewer 12” PVC –pipe; 6 to 16 ft. in depth – 1,500 LF
    • Contract amount $514,680.50
  • 2004 Highway 3 – Marlboro Ave. Sewer Replacement – City of Barnwell, SC
    • Gravity Sewer 8” to 10” PVC pipe;  0 ft. to 20 ft. in depth – 2,500 LF
    • Precast Manholes (4 ft. dia.)  – 10 ea.
    • Service Reconnections 4” & 6” PVC pipe – 24 ea.
    • Contract Amount $395,000.00
  • 2004 Sewer Rehabilitation – Mini System “E” – City of Dalton
    • Pipe Bursting – 15,800 LF total
    • 18” VCT to 24” HDPE pipe Sewer Main – 2,700 LF (static)
    • 8” VCT to 8” HDPE  pipe – 13,100 LF (pneumatic)
    • Bypassing of 18” sewer with two 6” sewage pumps
    • Contract amount $1,359,130,00
  • 2004 Wastewater System Improvements – Town of Huntingdon, TN
    • Pipe Bursting – 10,000 LF total
    • 6” VCT to 8” HDPE pipe – 500 LF (static)
    • 8” VCT to 8” HDPE pipe – 9,500 LF (pneumatic)
    • CIPP Lining -  8” VCT to 8” CIPP Lining – 1,100 LF
    • Manhole lining cementious – 150 v. ft.
    • Service Reconnections 6” PVC – 70 ea.
    • Contract amount $572,638.00
  • 2004 Wastewater System Improvements – City of Gray, GA
    • Pipe Bursting – 10,400 LF total
    • 4” VCT to 6” HDPE pipe - 2,400 LF (static)
    • 8” VCT to 8” HDPE pipe - 1,500 LF (static)
    • 8” VCT to 8” HDPE pipe - 6,500 LF (pneumatic)
    • Service Reconnections 6” PVC – 60 ea.
    • Contract amount $569,822.00
  • 2004 Highway 3 – Marlboro Ave. Sewer Replacement – City of Barnwell, SC
    • Gravity Sewer 8” to 10” PVC pipe;  0 ft. to 20 ft. in depth – 2,500 LF
    • Precast Manholes (4 ft. dia.)  – 10 ea.
    • Service Reconnections 4” & 6” PVC pipe – 24 ea.
    • Contract Amount $395,000.00
  • 2003 Sewer Rehabilitation for Penn Branch/Lake Katherine – City of Columbia, SC
    • Pipe Bursting (static) – 4,500 LF
    • 18” VCT to 28” HDPE pipe
    • Open Cut Gravity Sewer 24” & 18” DIPS – 6 ft. to 12 ft. in depth – 3,000 LF
    • Slip Lining 8”&10” HDPE to 16” VCT pipe – 2,000 LF
    • Contract amount $1,847,909.00
  • 2002 Burnt Fork Creek Relief Sewer Phase I; Dekalb County, GA
    • Pipe Bursting (static) – 4,750 LF
    • 16” to 22” HDPE pipe -2,700 LF
    • 16” to 20” HDPE pipe – 2,050 LF
    • Open Cut 20” DIPS - 2,800 LF; 18” DIPS 200 LF; Total LF:  3,000 LF
    • Contract Amount:  $1,852,000.00
  • 2001 Merrimon Avenue and North Swannona Sewer Project; Asheville, NC
    • Pipe Bursting (static) – 1,950 LF
    • 18” to 22” HDPE pipe – 250 LF
    • 10” to 18” HDPE pipe – 1,700 LF
    • Open Cut 18” DIPS – 250 LF
    • Contract Amount:  $649,861.00